Multi-Fluid Sedimentary Geothermal Energy Systems for Dispatchable Renewable Electricity

2015PresentationProc. of the World Geothermal Congress Melbourne, 19-25April

Abstract

Sedimentary geothermal resources typically have lower temperatures and energy densities than hydrothermal resources, but they often have higher permeability and larger areal extents. Consequently, spacing between injection and production wells is likely to be wider in sedimentary resources, which can result in more fluid pressure loss, increa sing the parasitic cost of powering the working fluid recirculation system, compared to hydrothermal systems . For hydrostatic geothermal resources , extracting heat requires that brine be lifted up production wells, such as with submersible pumps, which can consume a large portion of the electricity generated by the power plant. CO 2 is being considered as an alternative working fluid (also termed a supplemental fluid) because its advantageous thermophysical properties reduce this parasitic cost, and because of the synergistic benefit of geologic CO 2 sequestration (GCS). We expand on this idea by: (1) adding the option for multiple supplemental fluids (N 2 as well as CO 2 ) and injecting these fluids to create overpressured reservoir conditions , (2) utiliz ing up to three working fluids: brine, CO 2 , and N 2 for heat extraction, (3) using a well pattern designed to store supplemental fluid and pressure , and (4) time - shifting the parasitic load associated with fluid recirculation to provide ancillary services ( frequen cy regulat ion , load fo llowing , and spinning reserve) and bulk energy storage (BES) . Our approach uses concentric rings of horizontal wells to create a hydraulic divide to store supplemental fluid and pressure, much like a hydroelectric dam. While, as with any geothermal system, electricity production can be run as a base - load power source, p roduction wells can alternatively b e controlled like a spillway to supply power when demand is greatest. For conventional geothermal power, the parasitic power load for fluid recirculation is synchronous with gross power output. In contrast, our approach time - shift s much of this parasitic load, which is dominated by the power required to pressurize and inject brine . Th us, most of the parasitic load can be scheduled durin g minimum power demand or when, due to its inherent var iability, there is a surplus of renewable energy on the grid . Energy storage is almost 100 percent efficient because it is achieved by time - shifting the parasitic load. Consequently, net power can near ly equal gross power during peak demand so that geothermal energy can be used as a form of high - efficiency BES at large scales . A further benefit of our approach is that production rates (per well) can exceed the capacity of submersible pumps and thereby t ake advantage of the productivity of horizontal wells and better leverage we ll costs — which often constitute a major portion of capital costs . Our vision is a n efficient, dispatchable , renewable electricity system approach that facilitates deep market penet ration of all renewable energy sources: wind, solar, and geothermal, whi le utilizing and permanently storing CO 2 in a commercially viable manner