GEG Group
CPG
TANGO
ETH Zurich

Brine displacement by CO2, energy extraction rates, and lifespan of a CO2-limited CO2-Plume Geothermal (CPG) system with a horizontal production well

2015GeothermicsDOI: 10.1016/j.geothermics.2015.02.005View Publication ↗

No abstract is available for this publication.